methodos.gr

Selected Projects > Completion of the new Railway track of standard width, between Korinthos - Patra, from k.p. 59+000 to k.p. 75+000 (Akrata - Diakopto).

The part of the Railway track Korinthos - Patra from k.p. 59+000 to k.p. 75+000 (exit from the Railway Station Diakopto), consists of: (16) sixteen kilometers of double-track Railway,(9) nine transverse road underpasses, three upper pedestrian crossings, (3) three water bridges and (2) two tunnels with a total length 4.3 km. and 4.4 km. of parallel and crossing roads.

Contracting Employer: ERGOSE S.A.

  • sid2
    sid2
  • sid1
    sid1
+30 210 211 4731 - 35    /   +30 210 211 6040 4 Destouni str., 111 43 Kato Patisia, Athens
info@methodos.gr